Crude Oil Refinery

FOB Reference Price:Get Latest Price
  • >=1 Tons
    $1,980,000.00
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Hebei, China
Brand Name:
Wantong
After-sales Service Provided:
Engineers available to service machinery overseas
Name:
oil machinery
Capacity:
As customer requirement
Design:
by our engineer according to process flow
Condition:
New
Supply Ability
Supply Ability:
100000 Barrel/Barrels per Day
Packaging & Delivery
Packaging Details
as your requirement .
Port
Tianjin
Video Description

 

 

Crude Oil Refinery

 

Product Description

 

Micro Modular Oil Refineries capacities from 150 to 50,000 Barrels per Day,

150 to 50,000 Barrels Per Day Production capacity, Mobular units, High Capacity, Ability to process heavy oils,
Burrow Ltd & Partners are the world´s leader in the supply of modular refinery units, having successfully designed, fabricated, delivered, and installed modular refineries and gas plants across the globe since 1978, from the USA to countries such as Bangladesh and Indonesia, and also Nigeria.

Today, modular refineries can be supplied up to a size of 50,000 BPD, and include hydrodesulfurization units, naphtha catalytic reformers, catalytic isomerization units, or hydrocrackers. In other words, they are complete, modern refineries, highly competitive with those built by conventional construction. Such modular refineries can, depending on the cases, be built for nearly half the cost in nearly half the time. Even large conversion refineries of 200,000 BPD can be offered on a modular basis, building several trains alongside each other, and remain highly competitive with conventional construction.

With conventional foundation-mounted refinery equipment, each piece of equipment is placed on its individual foundation at the refinery site and welders pipe the equipment together. This “stickbuilt” conventional method, under the best of conditions, requires significantly longer construction time than modular
fabrication. But in remote locations, or places unfamiliar with industrial construction, the differences in time and efficiency of construction can be dramatic: In modular construction, rather than assembling all of the components at the refinery site, the facility's structure is reduced to smaller elements that are assembled efficiently and rapidly at the Burrow & Partners fabrication plant. By performing most or all of the fabrication and assembly at a Burrow & Partners manufacturing facility, the modules, as well as the workers that put them together, are not subjected to environmental dynamics like heat, wind, or rain. Modularization minimizes inclement weather delays. Controlled working conditions yield a higher-quality product. 

 

 

 

 

refinery product


1.The main Product and product’s percentage:

From the Atmospheric and vacuum distillation unit get the main product as follow :
(1) Naphtha and Gasoline , percentage : 21%--25%
(2)
Aviation Kerosene (Extracted from naphtha and Gasoline ), percentage : 8%--10%
(3) Diesel oil , percentage : 23%--28%
(4)Heavy diesel oil and wax oil (it can use for catalytic raw materials), percentage : 22%--28%
(5)Loss : percentage : 2%--3%

Packaging & Shipping

 

 

 

 

CRUDE oil FAQ
Anshu ISO CE proved GB standard crude oil to gasoline process petroleum refinery distillation oil gas refinery for sale

What is the warranty of the machines?
12 months free guanantee and life long standard paid service.
What is the raw material of your machinery?
Stainless steel and carbon steel.
When can I get the price?
Within 24 hours, if urgent, please directly contact us.
How to ask quotation?
Please inform us your crude oil specifications and your target capacity per day, then we will send our proposal as soon as possible.
Can we ask the oil plant for different types of oil?
Yes you can! But we recommend no more than 3 kinds of oils.
How many areas are required to build the plant refinery?
The land area required usually depends on the capacity of your plant. We can calculate the area needed and give you the plant designs.
How long will it take to get my products?
In general, it will take us 45-120 days to make the machinery, and 3-7days to shipping port.
Can you install the production line and train our stuffs for free?
Yes we can. We'll send engineers to help you install the equipment and train your workers freely.

product photo

 

 

 

Company Information

Company: Hebei Anshu Langsheng Machinery Technology Co., Ltd

 

Address:  868 Construction Street, Jizhou, Hebei, China (Mainland)

 

 Tel:  0086-318-6176965

 

 Fax: 0086-318-6176966

 

 Mob:0086-18330828552

 

 skype: Emily chen0321

 

 Name:Emily